  • Water-Sour Natural Gas Phase Behavior

    In the last Tip of the Month, we discussed the phase behavior of water-sweet natural gas mixtures. In this tip, we will demonstrate the water-sour natural gas phase behavior. In a future tip, we will address water content of acid gases.

    Water is produced with oil and gas. A question that comes to mind is: “Why is water important?” The presence of water may cause corrosion, freezing and hydrate formation. All of these problems are enhanced by the presence of acid gases such as H2S and CO2.

    A phase envelope with hydrate and water dew point curves is an excellent tool to find out what form/phase water is in at operating conditions, during start-up, during shut-down and during upsets. The water content of a gas depends on the system temperature, pressure and composition of the water containing gas. There are several methods of calculating of water content of sour gases. The details of these methods can be found in Chapter 6 of Volume 1 [1] and Chapter 9 of Volume 3 [2] of “Gas Conditioning and Processing”. In this work we will use Maddox et al. [3] (Figures 6.1, 2, 3 and Equation 6.2 of Volume 1) and the modified Soave-Redlich-Kwong (SRK EoS) reported in GPA RR-42 by Erbar et al. [4]. This version of SRK is tailor-fitted to handle water-hydrocarbon systems containing hydrogen sulfide and carbon dioxide.

    The compositions of several sour gases studied in this study along with their measured and predicted water contents are shown in Table 1. The Maddox et al. (referred to as Chart) results were generated using GCAP software and the modified SRK EOS results were generated by performing rigorous three-phase (gas-liquid hydrocarbons-aqueous) flash calculations. A trial version of GCAP can be downloaded here, at the bottom of the page.

    Table 1 indicates that as long as the total acid gas concentrations is less than 60 mole percent, Maddox et al. and the modified SRK methods produce results within the accuracy of experimental data. However, for higher concentrations of acid gases, the modified SRK provides a better prediction.  The water content of acid gas systems will be discussed further in the next Tip of the Month.

    Table 1

    The composition, experimental, and predicted water content by Maddox et al. and the modified SRK for two natural gas mixtures are presented in Table 2. The upper part of columns 1, 2, 4, 5 report the measured mole percent. Based on the feed compositions shown in columns 1 and 4, three-phase flash calculations using the modified SRK were performed and the resulting vapor stream compositions are shown in columns 3 and 6, respectively. Notice that the measured and predicted vapor compositions are not identical.  Inaccuracies in predicting the vapor composition can result in errors in predicting the water saturation.

    For each vapor stream, the saturated water content was predicted by both methods and is presented in the lower portion of this table. As can be seen from this table, both methods predict saturated water content reasonably well. Not surprisingly, the accuracy of both methods is improved slightly when the experimental vapor composition is used rather than the predicted vapor composition.

    Table 2

    Figure 1 represents the phase behavior for mixture A. This figure includes from right to left: the water dew point, hydrate formation, 25 weight percent methanol (MeOH) inhibited hydrate formation, hydrocarbon dew point, retrograde, and the bubble point curves, respectively. The blue-triangular-symbol water dew point curve is predicted by use of Figures 6.1, 6.22 and 6.3 with Equation 6.2 of Volume 1 (Maddox et al. method). The red curve represents the water dew point predicted by rigorous calculations using the modified SRK. It is interesting to see that both methods agree quite well with each other. The region to the right of the water dew point curve is gas phase and to the left, liquid water is present.

    Figure 2 presents the phase behavior of sour gas mixture B. With exception of low pressure region, both methods agree quite well.

    Figure 3 demonstrates the effect of acid gases on phase behavior of mixture B. As shown in this figure, the presence of acid gases shifts all of the curves to the right. In other words, the presence of acid gases increases the hydrate formation temperature considerably. It also increases the water dew point temperature. It should be noted that the water dew point curves have been generated for a fixed amount of water content predicted at specified separator condition. In this case the separator temperature and pressure were 120 °F [48.9 °C] and 1500 psia [10,342 kPa], respectively.

    Figure 1

    To learn more about similar cases and how to minimize operational problems, we suggest attending our G4 (Gas Conditioning and Processing)G5 (Gas Conditioning and Processing – Special) and RF-61 Refinery Gas Treating, Sour Water, Sulfur and Tail Gas courses.

    Dr. Mahmood Moshfeghian

    Reference:

    1. Campbell, J.M., “Gas Conditioning and Processing, Vol 1: The Basic Principles”, 8th Edition, Edited by R.A. Hubbard, John M. Campbell & Company, Norman, USA, 2001.
    2. Maddox, R.N., L.L. Lilly, “Gas conditioning and Processing, Vol 3: Computer Applications and Production/Processing Facilities”, John M. Campbell & Company, Norman, USA, 1982.
    3. Maddox, R.N., L.L. Lilly, M. Moshfeghian, and E. Elizondo, “Estimating Water Content of Sour Natural Gas Mixtures”, Laurance Reid Gas Conditioning Conference, Norman, OK, Mar., 1988.
    4. Erbar, J.H., A.K. Jagota, S. Muthswamy, and M. Moshfeghian, “Predicting Synthetic Gas and Natural Gas Thermodynamic Properties Using a Modified Soave Redlich-Kwong Equation of State,” Gas Processor Research Report, GPA RR-42, Tulsa, USA, 1980.
    5. Huang, S.S.-S., A.-D. Leu, H.-J. Ng, and D.B. Robinson, “The Phase Behavior of Two Mixtures of Methane, Carbon Dioxide, Hydrogen Sulfide, and Water” luid Phase Equil. 19, 21-32, 1985.
    6. Ng, H.-J., C.-J. Chen, and H. Schroeder, “Water Content of Natural Gas Systems Containing Acid Gas”, Research Report RR-174, Gas Processors Association, Tulsa, OK, 2001.

    Figures 2 and 3

  • Water-Sweet Natural Gas Phase Behavior

    In the past Tips of the Month, we discussed the phase behavior of water-free natural gas mixtures. In this tip, we will demonstrate the water-sweet natural gas phase behavior. In future tip, we will address wet sour gas.

    Water is produced with oil and gas. A question that comes to mind is: “why water is important?” The presence of water may cause corrosion, freezing and hydrate formation. Hydrates can even form at warm temperatures in the presence of water. Once hydrates are formed, they are hard to remove. For design and operation of a plant it is important to know:

    1. Where water is in the process?
    2. How much water is present?
    3. What form/phase water is in at operating conditions, during start-up, during shut-down and during upsets?

    A phase envelope with hydrate and water dew point curves is an excellent tool to answer the above questions. The water content of a gas depends on the system temperature, pressure and composition of the water containing gas. There are several methods of calculating of water content. The details of these methods can be found in Chapter 6 of Volume 1 and Chapter 9 of Volume 3 of “Gas Conditioning and Processing” [1, 2]. In this work we will use Figure 6.1 of Volume 1 and the modified Soave-Redlich-Kwong (SRK EoS) reported in GPA RR-42 by Erbar et al. [3]. This version of SRK is tailor fitted for water-hydrocarbon systems. The compositions of natural gases studied in this work are shown in Table 1.

    Table 1

    Figure 1 presents the phase behavior for mixture 1. This figure includes from right to left: the water dew point, hydrocarbon dew point, retrograde, hydrate formation, 25 weight percent methanol (MeOH) inhibited hydrate formation, and the bubble point curves, respectively. The blue-triangular-symbol water dew point curve is predicted by use of Figure 6.1 of Volume 1 and the red curve represents the water dew point predicted by rigorous calculations using the modified SRK. It is interesting to see that both methods agree quite well with each other. However, the results obtained by Figure 6.1 are somewhat more conservative. The region to the right of water dew point curve is gas phase and to the left the liquid water is present.

    Graphs 1 and 2

    Figure 2 presents the phase behavior for mixture 2 which contains heavier compounds including nC9H20. However, the water content is the same as in mixture 1. Note the position of the water dew points did not change but, the hydrocarbon dew point curve has moved to the right, as expected, due to presence of heavier compounds. At lower pressures, the water dew point curves coincide with the hydrocarbon dew point curve. This is merely by coincidence.

    Figure 3 presents similar phase diagram for mixture 3 which is essentially the same as mixture 1 except nC6H14 has been replaced with nC9H20. Again, the hydrocarbon dew point curve shifts to the right due to presence of nC9H20.

    Graph 3

    It is interesting to note that the dry hydrocarbon dew points and the wet hydrocarbon dew points predicted by SRK coincide very closely with each other; the difference is practically negligible. Also note that at a specified pressure, the higher of the two dew points (hydrocarbon and water) have been calculated by the SRK EoS. So, below about 1400 psia [9653 kPa], the wet hydrocarbon dew point is predicted while for pressures above 1400 psia [9653 kPa], the water dew point (the higher one) is predicted.

    Finally, mixture 2 has been passed through a separator at 100 °F [38 °C] and 1000 psia [6895 kPa] and the resulting vapor compositions from a three-phase flash calculation based on the SRK EoS is shown in the last column of Table 1 as mixture 4. Due to the removal of free water and heavy hydrocarbons from mixture 2, the phase envelope and the water dew point curve have moved to the left, as expected. At this condition, the water content by SRK EoS is 0.0012 mole fraction equivalent of 57 lbm/MMSCF or 914 kg/106 std. m3. Figure 4 indicates that the hydrocarbon dew point and water dew point curves intersect at 100 °F [38 °C] and 1000 psia [6895 kPa] which are the conditions of the separator.

    Due to the fact that hydrate formation is controlled mostly by lighter components, there are only small variations of the hydrate formation curve and its inhibition by 25 weight percent methanol in all four mixtures.

    To learn more about similar cases and how to minimize operational problems, we suggest attending our G4 (Gas Conditioning and Processing) and G5 (Gas Conditioning and Processing – Special) courses.

    By: Dr. Mahmood Moshfeghian

    Graph 4

    Reference:

    1. Campbell, J.M., “Gas conditioning and Processing, Vol 1: The Basic Principles”, 8th Edition, Edited by R.A. Hubbard, John M. Campbell & Company, Norman, USA, 2001.
    2. Maddox, R.N., “Gas conditioning and Processing, Vol 3: Computer Applications and Production/Processing Facilities”, John M. Campbell & Company, Norman, USA, 1982.
    3. Erbar, J.H., Jagota, A.K., Muthswamy, S. and Moshfeghian, M., “Predicting Synthetic Gas and Natural Gas Thermodynamic Properties Using a Modified Soave Redlich Kwong Equation of State,” Gas Processor Research Report, GPA RR-42, Tulsa, USA, 1980.
  • Consequence of Liquid Carry Over – Part 2: Fixed Heat Exchanger Area

    Many facility operating problems are related to improperly designed or under-sized gas-liquid separators. Due to the importance of separators, in the July Tip of the Month (TOTM), we studied the effect of liquid carry over in a simple dew point control plant. In that study, assuming variable area of the heat exchangers, we found that one percent liquid carry over can cause considerable change in compressor power requirement and heat exchanger duty. This assumption is valid if we are designing a new plant and the equipment is being sized for construction. However, for an existing plant, the heat exchanger areas are fixed. In the continuation of our previous study, we will revisit the same case study and investigate the consequence of liquid carry over but we will use the same heat exchangers (i.e. keeping UA constant; U=overall heat transfer coefficient and A=area).

    Let’s consider the same process flow diagram as shown in Figure 1 for a simple gas plant. The feed composition and conditions are shown in Table 1. We have already shown the impact of liquid carry over on the “sales gas dew point” and we experienced that for even a small liquid carry over (1 %), the dew point offset was about 6°F [3.3 °C]. We will demonstrate the consequences of liquid carry over on the other equipment while maintaining the “spec dew point”.

    Process Flow Diagram

    Figure 1. Process flow diagram for simple dew point correction gas plant

    It is desired to process this feed gas to produce a sales gas with a dew point of 20°F [-6.7 °C] at 540 psig [3.723 MPa] The feed gas is mixed with recycle gas from a stabilizer, compressed and cooled to 110°F [43.3°C] and 555 psig [3.827 MPa], then cooled in the gas-gas exchanger, gas-liquid exchanger and finally in the chiller to 20°F [-6.7°C] before entering the separator at 540 psig [3.723 MPa]. In real equipment, there would be some liquid carry over. In order to show the impact of liquid carry over, in the simulation we withdraw a small portion of liquid stream from the separator and remixed it with the vapor stream.  The solid curve in Figure 2 shows how the dew point of sales gas goes off spec as a function of the liquid carry over.

    In order to bring back the sales gas dew point to spec, we re-adjusted (lowered) the stream 7 temperature. The required degree of re-adjustment is shown by the dashed line in the same figure. As a consequence of re-adjusting of the stream 7 temperature, the conditions of other equipment and streams changed. Figure 3 shows the variation of compressor power and the heat exchanger duties as a function of liquid carry over. As can be seen in this figure, one percent liquid carry over can cause considerable change. For this case, the percent changes ranged from 0 to 27 percent. The changes in the reboiler duty, sales gas and LPG flow rates were negligible. Contrary to the findings of the July TOTM, here we see that the chiller duty increases as we expected.

    Not included in this analysis is an examination of the affect of lowering the chiller outlet temperature on the refrigeration system.  In an existing plant, to lower the refrigerant temperature, the chiller would have to operate at a lower pressure so that the power required for the refrigerant compressor would increase. The overall effect of liquid carry over is the increase in the operating cost, as expected.

    To learn more about similar cases and how to minimize operational problems such as liquid carry over, we suggest attending our G4 (Gas Conditioning and Processing) and G5 (Gas Conditioning and Processing – Special) courses.

    By: Dr. Mahmood Moshfeghian

    Tables 1 and 2Graphs 1 and 2

  • Vigilance in Outside Contracting

    The Tip of the Month for May raised awareness of the role of process safety management (PSM) in preventing accidents. You may be aware that OSHA 29 CFR 1910.119 determines what constitutes a PSM regulated facility and other laws such as Section 304 of the Clean Air Act address PSM training for employees. These are examples of efforts to drive increased vigilance for safety in industries such as Oil and Gas, but how are we applying this vigilance to our contracting processes? How do we avoid having outside contractors represent the highest percentage of reported injuries and fatalities or be the cause of them? There are a couple of keys to being on top of contractor safety management that apply to both engineering and contracting professionals.

    In many respects, contractor safety is inherently more difficult to maintain than the safety of our own employees. For one thing, multiple business cultures are involved when contractors are working on our sites. The contracting process must overcome differences in safety standards, attitudes, training and communications between all the parties. This may be a concern for a single project with multiple contractors and sub-contractors or it may result from a revolving door of unique contractors used to meet ongoing requirements for operations and maintenance activities. Vigilance in this case starts with recognition of the dynamic nature of the workforce involved.

    Secondly, there can be a general tendency with contracting terms and conditions, originally designed to raise the level of awareness and vigilance for contractor safety, to simply become safety “boilerplate” included in a mountain of documents. Warning signs of this problem can occur in two ways:

    • Data collected in the contracting qualification phase is simply reviewed for completeness and then filed without proper analysis for each specific job being contracted. A contractor might be PSM approved, have provided required OSHA logs and a list of Health, Safety and Environmental (HSE) training programs and still not have dealt with a particular hazard that applies to the job in question. Who will uncover this information before the job begins?
    • Contract terms and conditions for safety become standardized (as they should), but there are little or no job-specific terms and conditions added in each contracting process (the one-size-fits-all contract syndrome). Who tells the contracting department what unique hazards are involved in each job? Does the contracting department require a job hazard analysis or pre-job meeting and safety plan when putting a contract together in order to expand the language appropriately?

    Example:

    According to a 2003 bulletin from the U.S. Chemical Safety Board on nitrogen asphyxiation, there had been 80 deaths and 50 injuries from asphyxiation over a period of ten years ending in 2002. Yet there have been instances since of workers and contractors not adequately warned or trained to avoid improper entry into an unsealed, confined space under a nitrogen purge.

    Regardless of any safety training documentation provided by the contractor or safety language commonly found in the contract, I would want to see a clear statement that this job involves work around a vessel containing nitrogen. There then should be a formal, documented acknowledgement that these workers (by name) are trained in the hazards of nitrogen purges and oxygen-deficient atmospheres and have been instructed about client company confined space entry rules. They must know that “oxygen deprivation rapidly overcomes victims, there is no warning before being overcome, oxygen-deficient atmospheres might exist outside confined space openings and rescuers must strictly follow safe rescue procedures.” A contractor safety plan might include required steps by the client to barricade the work area and post warning signs for a particular job. There may have been hundreds of other recent contracts that had nothing to do with this type of hazard and yet the contracting process needs to be able to put it on the table in this instance. It requires the help of everyone involved to identify, communicate and document these needs.

    Vigilance in contracting requires use of all the information we collect in the contracting process. For example, ISN is billed as the leader in Compliance Records Management and Reporting with more than 8,600 contractors and 100 owners using the service. As a result, most major oil companies are owner/subscribers to ISNetworld as a standard tool for HSE compliance among other things. How is the contracting function using this tool? In the interest of maintaining vigilance, is there a measure of this use?

    If 100 contracts are issued each month involving outside contractor work, how many inquires are made to ISNetworld to review and verify HSE records or information? Like tracking hits on a website when new marketing campaigns are launched, there should be a user metric that correlates to new contracts being issued. If inquiries are not being made as contracts are finalized, why not?

    In our PetroSkills approved course, SC-41 Contracts & Tenders Fundamentals, there is a role playing exercise that ties much of this discussion together. The scenario involves role playing as representatives of owner and contractor teams to review requirements for demolition of an old sulfur recovery plant. With the plant being out of service for 10 years and “hydrocarbon free,” there is a disagreement about the need and expense for gas tests on the lines to be removed and Nomex protective wear provided for the contract workers. How will a contract move forward?

    The first indication of contracting vigilance demonstrated in the exercise is simply in having such a meeting instead of just passing contractual documents back and forth prior to the work initiation. Second it demonstrates how this type of pre-job meeting will highlight the understanding, issues and concerns of both parties while providing the means to contractually document, communicate and monitor the resulting HSE requirements going forward.

    In May, Clyde Young concluded his Tip of The Month with the observation that safety culture can be defined as “the way we do things around here.” That certainly applies to working with outside contractors and should raise the question of whether constant vigilance is adequately built into the contracting process.

    To learn more about roles and responsibilities in contracting processes, we suggest attending our Contracts & Tenders Fundamentals course. Other Supply Chain, Operations Management and HSE courses may be found on our website.

    By: Ronn Williamson
    Instructor / Consultant

  • Consequence of Liquid Carry Over in a Simple Dew Point Control Plant

    Problems in meeting sales-gas dew point specifications are not unusual. A facility engineer often suspects separator carryover when trouble-shooting such a plant. Proper sizing of equipment for vapor-liquid separation is essential to almost all processes. The fundamentals of a simple separator design may be extended to several other processes such as fractionation towers, two-phase flow, slug catcher design etc. Many facility operating problems are related to improperly designed or under-sized gas-liquid separators.

    Let’s consider the process flow diagram shown in Figure 1 for a simple gas plant. The feed composition and conditions are shown in Table 1. In one of our past Tip of the Months (TOTM) we demonstrated the impact of liquid carry over on the “sales gas dew point” and we experienced that for even a small liquid carry over (1 %), the dew point offset was about 6°F [3.3 °C]. In this Tip of the Month, we will demonstrate the consequences of liquid carry over on the other equipment while maintaining the “spec dew point”.

    Process Flow Diagram

    It is desired to process this feed gas to produce a sales gas with a dew point of 20 °F (-6.7 °C) at 540 psig (3.723 MPa) The feed gas is mixed with recycle gas from a stabilizer, compressed and cooled to 110°F (43.3°C) and 555 psig (3.827 MPa), then cooled in the gas-gas exchanger, gas-liquid exchanger and finally in the chiller to 20°F (-6.7°C) before entering the separator at 540 psig (3.723 MPa). In real equipment, there would be some liquid carry over. The commercial simulators will assume a perfect gas-liquid separation unless the users manually force some carryover. In order to show the impact of liquid carry over, in simulation we withdraw a small portion of liquid stream from separator and remixed it with the vapor stream. The solid curve in Figure 2 shows how the dew point of sales gas goes off spec as a function of the liquid carry over.

    In order to bring back the sales gas dew point to spec, we re-adjusted (lowered) the stream 7 temperature. The required degree of re-adjustment is shown by the dashed line in the same figure. As a consequence of re-adjusting of the stream 7 temperature, the conditions of other equipment and streams changed. Figure 3 shows the variation of compressor power and the heat exchanger duties as a function of liquid carry over. As can be seen in this figure, a-one percent liquid carry over can cause considerable change. For this case, the percent changes ranged from 15 to 55 percent. The changes in the reboiler duty, sales gas and LPG flow rates were negligible. Please note that we assumed variable area of the heat exchangers. If this analysis is done prior to building a new plant, the largest heat exchangers needed could be purchased. However, in an existing plant the heat exchanger areas are fixed. An interesting “surprise” can be seen in Figure 3, the duty of chiller went down as the liquid carryover increased. This is due to the fact that the enthalpy of stream 6 decreases more than the required change in the enthalpy (temperature) of the cold separator. Therefore the process gas duty across the chiller decreases as the liquid carry over increases (see Table 2). In other words, liquid carry-over from the LTS makes the gas/gas heat exchanger into a “chiller” as the liquids vaporizes in that heat exchanger, lowering actual chiller duty, but still increasing the sales gas dewpoint temperature.

    Not included in this analysis is an examination of the affect of lowering the chiller outlet temperature on the refrigeration system. In an existing plant, to lower the refrigerant temperature, the chiller would have to operate at a lower pressure so that the power required for the refrigerant compressor would increase. The overall effect of liquid carry over is the increase in the operating cost, as expected.

    To learn more about similar cases and how to minimize operational problems such as liquid carry over, we suggest attending our G4 (Gas Conditioning and Processing) and G5 (Gas Conditioning and Processing – Special) courses.

    By: Dr. Mahmood Moshfeghian

    Tables 1 and 2 

    Graphs 1 and 2

  • Why do I care about phase diagrams?

    In facilities operations the understanding of where the process is on a phase diagram can often help the engineer and operator avoid extremely embarrassing design and operating mistakes. The oil and gas industry is full of many “war stories” about “phase diagram disasters.” Most instances are never related back to the phase diagram misunderstanding. In one well-documented but poorly published case a “dry gas” pipeline that was pigged flooded miles of sandy beach. In another case thousands of kilowatts of compression power were installed to maintain the pressure of a reservoir above the dew point when in fact the reservoir was at a temperature above the cricondentherm. In many cases equipment manufacturers and purchasers of gas have specifications of “superheat” or dew point that have not been met and led to upset customers and/or millions of dollars of lawsuits.

    One of the first issues to be resolved by a facilities engineer working in a gas plant or gas production facility is where is the process operating with respect to the phase diagram. A general knowledge, if not a detailed knowledge, will allow the design engineer and the facilities operator to make intelligent decisions that have significant impact on the profitability of a gas production facility.

    The following figure is a “generic hydrocarbon mixture” phase diagram for a lean gas. The area to the left of the Bubble Point line is the sub-cooled liquid region.

    Graph 1

    The area to the right of the Dew Point line is the super-heated gas region. Between these two lines the mixture is two-phase. Other areas of interest are the retrograde region and the supercritical region. Each of these regions provides advantages and disadvantages for operations.

    This month we will start to define the points of interest so that we may choose proper operating points for various types of processes. The first point to define is the cricondentherm. The definition of this point is the highest temperature at which twophases (liquid and vapor for most processes) can coexist. In Figure 1, this is point M. Point M has considerable theoretical and practical importance. For example, if the cricondentherm for a sales gas (point M) is 0 ºC (32 ºF) cooling the gas to 4 ºC (40 ºF) at any pressure will not result in condensation of liquids. This type of operation is typically the type used for cross-country transportation of gas in pipelines. Operation with this type of system will not require “slug catchers” at the end of the pipeline and will significantly decrease pressure drop in the pipeline.

    If the gas were processed in a cold separator such that point B (a dew point) was 0 ºC (32 ºF) problems could occur in the same conditions as the pipeline mentioned above. If the pressure of the pipeline was between the pressure of point B and F and the pipeline cooled to 4 ºC (40 ºF) there could be significant quantities of liquid in the pipeline. If the operations people were not familiar with the phase diagram they might increase the operating pressure of the cold separator and still keep the temperature at 0 ºC (32 ºF). This action would result in increased liquids in the pipeline, not decreased. However, if the cold separator was operated at the pressure of point M, at a temperature of 0 ºC (32 ºF), in theory there would be no liquids in the pipeline again. (More about the difference between theory and practice in future tips).

    Graph 2

    To learn more about similar cases and how to minimize operational problems, we suggest attending our G4 (Gas Conditioning and Processing) and G5 (Gas Conditioning and Processing – Special) courses.

    Dr. Larry L. Lilly

  • Vigilance With a Healthy Dose of Fear

    In this Tip of the Month we will focus on HSE (Health, Safety, and Environment) issues, specifically on “Process Safety” in the Oil and Gas Industry.

    Anyone working in the oil and gas industry during the last several years has probably been affected by or at the very least, heard about the “big crew change”. Whether you are in the large group of people waiting for retirement age, or a fairly new hire looking forward to a bright career, you are part of this change. Change inevitably brings challenge. And one of the big challenges is how do we transfer the knowledge and experiences from that first, experienced group to the eager but inexperienced group?

    Meeting this challenge is vital in the area of process safety. While there are many technical engineering tasks that must be performed to ensure process safety, management of the system requires that all personnel involved in process safety understand their role within the process safety management (PSM) system. Performing a specified role within a system is a skill that can be learned and does not necessarily come naturally to people.

    Some companies have established PSM systems to meet regulatory requirements in the countries in which they operate. There are some differences in the regulatory requirements but in general PSM systems contain the major elements found in the American Petroleum Institute’s (API) Recommended Practice 750, “Management of Process Hazards.” RP 750 contains these elements of a PSM system, Process Safety Information (PSI); Process Hazard Analysis (PHA); Management of Change (MOC); Operating Procedures; Safe Work Practices; Training; Quality and Mechanical Integrity; Pre-startup Safety Review (PSSR); Emergency Response and Control; Incident Investigation; and Audits. In addition to API, more guidance can be found through the American Institute of Chemical Engineers’ (AIChE) Center for Chemical Process Safety (CCPS). RP 750 is a system to manage process safety, the policies and procedures established for this are similar to any systems approach to a project.

    Understanding and managing the interrelationship among all these elements is generally too much for every person in an organization, so individual departments are sometimes tasked with this. But, every person in the organization plays a role in the overall management system.

    As the workforce changes, experience leaves and inexperience replaces, it becomes difficult at times to perform the work required to manage the business. Personnel sometimes become so focused on individual jobs that they sometimes forget that the things they do have an impact on the system. It is therefore important to have a system in place that directs actions and ensures that all issues are addressed before changes are made that affect the processes, which produce the products being delivered.

    “Preventing process accidents requires vigilance. The passing of time without a process accident is not necessarily an indication that all is well and may contribute to a dangerous and growing sense of complacency. When people lose an appreciation of how their safety systems were intended to work, safety systems and controls can deteriorate, lessons can be forgotten, and hazards and deviations from safe operating procedures can be accepted. Workers and supervisors can increasingly rely on how things were done before, rather than rely on sound engineering principles and other controls. People can forget to be afraid.” This statement from the report of The B.P. U.S. Refineries Independent Safety Review Panel, also known as the Baker Panel, provides the tip of the month: Vigilance with a healthy dose of fear.

    All personnel in the organization need to be able to discuss process safety issues. In order to do this effectively, they should keep up to date on incidents, new methods and all other issues associated with process safety in the oil and gas industry. The following table provides sources of information available on the Internet that may be helpful:

    Organization Web site
    U.S. Chemical Safety Board www.csb.gov
    U.S. Occupational Safety and Health Administration www.osha.gov
    International Association of Oil & Gas producers (OGP) www.ogp.org.uk
    Center for Chemical Process Safety www.aiche.org/CCPS
    American Petroleum Institute EHS www.api.org/ehs/health/
    Health and Safety Commission in the UK www.hse.gov.uk/
    Work Safe BC in Canada www.worksafebc.com

    This is a small sampling of the information available through the Internet to guide personnel in the philosophies, tools and techniques available for safety management systems. To stay abreast of recent events in the field, consider creating news alerts for the following: refinery fire, plant explosion, toxic release, industrial accident, workplace injury, workplace fatality. While you may receive information that is not specifically relevant to the oil and gas industry, some alerts may present a topic that is being addressed within your organization.

    “The U.K. Health and Safety Executive describes safety culture as “the product of individual and group values, attitudes, competencies and patterns of behaviour that determine the commitment to, and the style and proficiency of, an organization’s health and safety programs” (HSE, 2002). The CCPS cites a similar definition of process safety culture as the “combination of group values and behaviors that determines the manner in which process safety is managed” (CCPS, 2007, citing Jones, 2001). Well-known safety culture authors James Reason and Andrew Hopkins suggest that safety culture is defined by collective practices, arguing that this is a more useful definition because it suggests a practical way to create cultural change. More succinctly, safely culture can be defined as “the way we do things around here” (CCPS, 2007; Hopkins, 2005). An organization’s safety culture can be influenced by management changes, historical events, and economic pressures.”1

    Whether you are one of those older, more experienced people or one of those inexperienced but eager newly hired people, consider how you will work within and influence the safety culture of your organization.

    To learn more about process safety and HSE management systems, enroll in JMC/PetroSkills Facilities HSE courses:HS 44 and HS 45. Other HSE courses are available to develop HSE related competencies and may be found on our web site.

    By: Clyde Young
    Instructor/Consultant

    References:

    1 U.S. Chemical Safety and Hazard Investigation Board, final report of BP Texas City explosion, March 23, 2005.

     

  • MEG Dehydration Ability in MEG Injection Plant

    In order to continue the last tip of the month’s discussion on MEG injection plant, in this “Tip of the Month”, we will focus on two more questions:

    1. Does MEG have any dehydration ability at the three phase cold separator condition of a typical mechanical refrigeration plant?
    2. What is the dehydration ability of MEG if the mechanical refrigeration in a typical MEG injection plant goes out of service?

    As described in the last tip of the month, a typical mechanical refrigeration process is used for hydrocarbon dew point control and moderate NGL recovery that uses MEG injection to prevent hydrate formation. Warm inlet gas is cross-exchanged with the cold dry sales gas and then flows to the gas chiller. To prevent hydrates from forming, MEG is injected in the tubes at the warm end of both exchangers. The temperature of the chiller is adjusted to condense liquids from the feed gas. The cold gas exiting the chiller together with the rich MEG solution and condensed hydrocarbons enters the cold three-phase separator. The rich MEG is sent to the regeneration section of the unit where the water is removed. The resulting lean MEG is sent back to the process. In short, two things are taking place: temperature reduction of the process gas to condense both water and hydrocarbons; and, MEG injection and subsequent regeneration to prevent hydrates from forming. In this scheme, the sales gas exiting the gas-to-gas exchanger has a water and hydrocarbon dew point determined by the operating temperature of the cold separator. The key point to remember here is that the water is being removed from the gas by low temperature condensation. The purpose of the injected MEG is not to “dehydrate” the gas but to prevent formation of hydrates. For more detail, refer to chapters 6 and 16 of Gas Conditioning and Processing, Volumes 1 and 2, [1, 2] respectively.

    Question 1: Does MEG have any dehydration ability at the three phase cold separator condition of a typical mechanical refrigeration plant?

    In order to answer this question, first we determine the water dew point temperature without any MEG injection and compare the results with the case of 80 weight percent lean MEG injection. Let’s assume a typical natural gas, cold separator pressure of 40 bara and -20°C [580 psia & -4°F] with 10 weight dilution (i.e. rich MEG concentration of 70 weight %). By performing computer simulation using ProMax [3], the water dew point temperature:

    • without MEG injection is -22.7°C (-8.7°F) corresponding to water content of 30.72 kg/106 std m3 [1.94 lbm/MMSCF]
    • with MEG injection is -29.6°C (-21.2°F) corresponding to water content of 17.6 kg/106 std m3 (1.11 lbm/MMSCF)

    Therefore, the water dew point temperature depression is 6.9°C (12.4°F). Similarly, a water dewpoint temperature depression of 7.8°C [14°F] was obtained for the case of 5 weight percent MEG dilution (i.e. rich MEG concentration of 75 weight %). These results indicate that even at low temperature, in addition to the hydrate inhibition effect, MEG has the ability to do partial dehydration. It should be noted that for this gas the hydrate formation temperature at 40 bara [580 psia] is 14.9°C [58.7°F].

    Question 2: What is the dehydration ability of MEG if the mechanical refrigeration in a typical MEG injection plant unexpectedly goes out of service?

    Let’s assume the same gas as in question 1 is passing through a mechanical refrigeration system with the same chiller temperature of -20°C [-4°F]. Let’s also assume that due to the break down of mechanical refrigeration system (lack of chilling) the cold separator temperature reaches 21.1°C [70°F]. Again, we used ProMax to perform the simulations and the calculated results are plotted in Figures 1 (A&B) and 2 (A&B). Figure 1 (A&B) presents the effect of lean MEG circulation rate on water dew point temperature and water content. Figure 2 (A&B) indicates that for a 10 weight % dilution, about 4350 kg MEG solution per 106 std m3 [270 lbm MEG solution per MMSCF] of gas is required. Figure 2 (A&B) also indicates that for this amount of dilution, the water dew point temperature drops from 21.1°C [70°F] to about 12.2°C [54°F] and the corresponding water content drops from 567 to 325 kg/106 std m3 [35 to 21 lbm/MMSCF]. Again, it can be seen that the MEG can dehydrate natural gas partially at higher temperature. It is also interesting to see from Figures 1 and 2 that further increase in lean MEG solution circulation rate, beyond 4350 kg/106 std m3 [270 lbm/MMSCF], does not reduce the water dewpoint temperature considerably and; therefore, it justifies the rule of thumb for 10 weight % dilution.

    For more information about dehydration and hydrate inhibition, the reader should refer to JMC books and enroll in our G4 (Gas Conditioning and Processing) and G5 (Gas Conditioning and Processing – Special) courses.

    By Dr. Mahmood Moshfeghian

    References:

    1. Campbell, J. M. “Gas conditioning and processing, Volume 1: Basic Principles,” 8th Ed., John M. Campbell and Company, Norman, Oklahoma, USA, 2001.
    2. Campbell, J. M. “Gas conditioning and processing, Volume 2: The Equipment Modules,” 8th Ed., John M. Campbell and Company, Norman, Oklahoma, USA, 2000.
    3. ProMax, version 1.2, Bryan Research & Engineering Inc, Bryan, Texas, 2005.

    Figure 1AFigure 1BFigure 2AFigure 2B

  • MEG Injection vs. TEG Dehydration

    In this “Tip of the Month”, we will focus on the question of: Which technology should you choose? The answer, of course, is “It depends.” It depends on what you are trying to accomplish, the constraints imposed on your system and the relative economics.

    A Rule of Thumb is “Use MEG injection if you have to cool the gas for NGL recovery anyway.” Like all Rules of Thumb, there are exceptions. But let’s explore the basics of each technology.

    Let’s begin by defining our terms. See Figure 1 for a typical mechanical refrigeration process used for hydrocarbon dew point control and moderate NGL recovery that uses MEG injection to prevent hydrate formation. Warm inlet gas is cross-exchanged with the cold dry sales gas and then flows to the gas chiller. To prevent hydrates from forming, MEG is injected in the tubes at the warm end of both exchangers. The temperature of the chiller is adjusted to condense liquids from the feed gas. The cold gas exiting the chiller together with the rich MEG solution and condensed hydrocarbons enters the cold three-phase separator. The rich MEG is sent to the regeneration section of the unit where the water is removed. The resulting lean MEG is sent back to the process.

    Process Flow Diagram

    Copyright © 2007 John M. Campbell and Company

    Figure 1. Typical mechanical refrigeration plant with glycol injection system [1]

    In this flow diagram, two things are taking place: temperature reduction of the process gas to condense both water and hydrocarbons; and, MEG injection and subsequent regeneration to prevent hydrates from forming. Inspection of Figure 1 reveals the majority of the equipment, including the refrigeration compressors, etc. which are not shown, is employed to reduce the temperature. Besides mechanical refrigeration, other options to achieve the required gas cooling include JT – valve expansion or use of a turboexpander. For either of these options, the MEG injection and regeneration portion of this plant is minor by comparison.

    In this scheme, the sales gas exiting the gas-to-gas exchanger has a water and hydrocarbon dew point determined by the operating temperature of the cold separator. The CAPEX of this system is essentially driven by the gas cooling equipment, including the refrigeration system. The key point to remember here is that the water is being removed from the gas by low temperature condensation. The purpose of the injected MEG is not to “dehydrate” the gas but to prevent formation of hydrates. At the MEG concentrations normally used in these systems, approximately 80 – 85 wt%, the MEG absorbs only a small amount of water vapor from the gas.

    Let’s now look at a typical circulating TEG system. See Figure 2. The same rich, water saturated natural gas stream flows to a properly sized inlet separator to remove liquids. The gas then enters a glycol contactor equipped with either structured packing or bubble cap trays. As the gas rises, the water is removed by the falling TEG. The concentration of the lean glycol entering the top of the contactor is the main variable that determines the water dew point specification that can be made. The rich glycol that leaves the glycol contactor is sent to a flash drum and then to a regeneration section. The lean glycol leaving the regenerator is then returned to the contacting tower.

    In this system, we are only making water dew point specification gas. The NGL content/hydrocarbon dew point of the sales gas is the same as that of the feed gas. Circulating TEG systems are therefore used only for dehydration. A significant cost item for the circulating TEG system is the high pressure contacting tower.

    Now let’s explore how we can compare and contrast these two technologies.

    If your objective is to make only pipeline water specification gas, you will most likely choose a circulating TEG system. This is intuitively obvious from a comparison of the two flow diagrams cited above. Assume, for example, that you want to dehydrate a lean natural gas stream that is water saturated at 70 bar and 40°C. A quick comparison of Figures 1 and 2 shows that there is much more equipment associated with chilling the feed gas (Figure 1 + the refrigeration compressors, etc. that are not shown) then there is with a circulating TEG system (Figure 2). Hence, for dehydration only to pipeline water specifications, a circulating TEG system will almost always be selected.

    On the other hand, if your objective is to recover hydrocarbons and remove water simultaneously, then a low – temperature process with MEG injection may be the best choice. Assume you have a rich natural gas stream that is water saturated at 70 bar and 40°C. Assume a mechanical refrigeration process is selected for hydrocarbon liquids recovery with a cold temperature of -35°C. We have two options to consider: we can dehydrate the gas with a circulating TEG system to a water dew point of -35°C and then send the dehydrated gas to an LTS plant consisting of a gas-to-gas exchanger, chiller, refrigeration system, etc., but with no MEG injection/regeneration system; or, we can send the feed gas directly to the LTS plant which has an MEG injection system retrofitted to prevent hydrates from forming.

    Figure 2

    Copyright © 2007 John M. Campbell and Company

    Figure 2. Basic glycol dehydration unit [2]

    Since the underlying equipment required to recover NGL’s is the same in both options, the cost comparison is essentially between the circulating TEG system and the MEG injection system. The TEG system will use less circulating rates then the MEG system, but will likely have a higher regeneration duty. Achieving the large dew point depression of 75°C with a circulating TEG system will be challenge and will add to the system cost. The key difference, however, is the circulating TEG system requires a high pressure contactor while the MEG injection system does not. In this situation, the most likely choice will be to go with the MEG Injection system.

    For more information about dehydration and hydrate inhibition, the reader should refer to JMC books and enroll in our G4 (Gas Conditioning and Processing) and G5 (Gas Conditioning and Processing – Special) courses.

    By Harvey M. Malino and Mark Bothamley

    References:

    1. Campbell, J. M. “Gas conditioning and processing, Volume 1: Basic Principles,” 8th Ed., John M. Campbell and Company, Norman, Oklahoma, USA, 2001.
    2. Campbell, J. M. “Gas conditioning and processing, Volume 2: The Equipment Modules,” 8th Ed., John M. Campbell and Company, Norman, Oklahoma, USA, 2000.
  • Friction Pressure Drop Calculation

    Introduction

    Engineers are frequently asked to calculate the fluid pressure drop in a piping system. Many software programs are available for solving complicated hydraulic problems; however’ they can be complex and difficult to use. In addition, there are many tables or shortcut methods that give adequate answers but they usually apply to predefined conditions which are sometimes misleading or less accurate. This “Tip of the Month” discusses a method of calculating friction pressure losses for liquid lines. A spreadsheet is presented that gives friction losses based on this method.

    Background Information

    Equation 1 is known as the Darcy-Weisbach (sometimes called the Darcy) equation and has been used by engineers for over 100 years to calculate fluid flow pressure loss in pipe. This equation is derived by dimensional analysis and relates the various parameters that contribute to the friction loss. A correction factor, called the Moody friction factor, is included which compensate theoretical results with the experimental results.

    Equation 1

    Where:

    hL = Head loss due to friction, m [ft]
    f = Moody friction factor
    L = Pipe length, m [ft]
    V = Velocity, m/s [ft/sec]
    g = Gravitational acceleration, 9.81 m/sec2 [32.2 ft/sec2]
    D = Inside diameter, m [ft]

    The task of determining the friction factor can be difficult due to the many variables that influence flow behavior. For example, the friction factor is significantly different if the fluid flow exhibits Newtonian or non-Newtonian behavior, or if the flow is laminar or turbulent. Other variables that influence the friction factor are properties of the pipe represented by absolute roughness and inside diameter, and fluid parameters such as flow rate, viscosity and density.

    The Moody diagram given in Figure 1 is a classical representation of the fluid behavior of Newtonian fluids and is used throughout industry to predict fluid flow losses. It graphically represents the various factors used to determine the friction factor. For example, fluids with a Reynolds number of 2000 and less, the flow behavior is considered a stable laminar fluid, and the friction factor is only dependent on the Reynolds number. The friction factor for the Laminar Zone is represented by Equation 2. Fluids with a Reynolds number between 2000 and 4000 are considered unstable and can exhibit either laminar or turbulent behavior. This region commonly referred to as the Critical Zone, and the friction factor can be difficult to accurately predict. Judgment should be used if accurate predictions of fluid loss are required in this region. Either Equation 2 or 3 are commonly used in the Critical Zone. Beyond 4000, the fluid is considered turbulent and the friction factor is dependent on the Reynolds number and relative roughness. For Reynolds numbers beyond 4000, the Moody diagram identifies two regions, Transition Zone and Completely Turbulent Zone. The friction factor represented in this region is given by Equation 3.

    Graph 1

    Figure 1. Moody Friction Factor Diagram

    Equations

    Where:

    Re = Reynolds Number
    V = Fluid velocity, m/s [ft/sec]
    D = Inside diameter, m [ft]
    e = absolute pipe roughness, m [ft]
    ? = Fluid density, kg/m3 [lbm/ft3]
    µ = Fluid viscosity, kg/(m-s) [lbm/(ft-sec)]

    The Method

    The Colebrook formula, Equation 3, is used throughout industry and accurately represents the Transition and Turbulent flow regions of the Moody Diagram. However, this implicit equation is difficult to solve by manual methods. Typically an iterative method is used to solve the Colebrook equation. One method of solving this equation is with numerical analysis technique called Newton-Raphson’s1 Method. This successive approximation approach is represented by Equation 5, and involves 1) the Colebrook formula, 2) the first derivative of the Colebrook formula and 3) an initial guess. Since the Colebrook formula is a convergent equation, the solution is usually determined with less than four iterations.

    Equation 5

    Where:

    fn = nth iteration friction factor
    fn+1 = (n+1)th iteration friction factor
    g(fn) = Colebrook equation
    g'(fn) = First derivative of Colebrook equation

    A macro that solves the Colebrook formula is given in this spreadsheet. It is easily adapted to programmable calculators. The iterative method assumes that the following input variables are available:

    Pipe inside diameter – mm [in]
    Pipe length – m [ft]
    Absolute roughness – m [ft]
    Absolute viscosity – cP
    Fluid relative density
    Fluid flowrate – m3/h [gpm]

    Example Problem

    The macro begins with inputting the variables needed to solve for the Moody friction factor. Next, the macro determines the Reynolds Number. If the Reynolds value is below 2000 the flow is considered laminar and a simplified friction formula shown in Equation 2 is used. Above 2000 the flow is considered turbulent and the Colebrook formula is used. Finally, the Moody friction factor is determined and combined with the Darcy formula, Equation 1, to determine the fluid friction losses.

    Results

    Numerous results were checked against values given in “Cameron Hydraulic Data Book”2 and found to vary by less than one percent. A term called “Delta-F” is also given in the spreadsheet which gives an indication of the variance in the Colebrook equation and the calculated value. Values of Delta-F less then 0.05 indicates an accuracy of three or more decimal places.

    Alternate Method:

    An alternate method of determining the friction factor is given by Chen3. His method of calculating the friction factor is explicit and does not require iterations to solve. This method has been by studied by Gregory and Fogarasi4, and found to give satisfactory values compared to the Colebrook equation. For those interested in this alternate approach, see Equation 6.

    Equations 6 and 7

    Where:

    f = Fanning friction factor (1/4 of Moody friction factor)
    D = Inside diameter, m [ft]
    e = absolute pipe roughness, m [ft]
    Re = Reynolds Number

    To learn more about friction factor and its impact on piping and pipeline calculation, design and surveillance, refer to JMC books and enroll in our ME41PL4PL61, and G4 courses.

    By: Joe Honeywell
    Instructor & Consultant

    References:

    1. “Elementary Numerical Analysis”, by S. D. Conte, McGraw-Hill Book Company, 1965, pp 30
    2. “Cameron Hydraulic Data Book”, by Ingersoll-Rand Company, Woodcliff, N. J., 15 ed., pp 3-49 to 3-85
    3. Chen, N.H., An Explicit Equation for Friction Factor in Pipe, Ind. Eng. Chem. Fund., 18, 296,1979
    4. Gregory, G.A. and Fogarasi, F., Alternate to Standard Friction Factor Equation, Oil & Gas Jour. Apr. 1 1985, pp 127.